The Work That Matters

We're not just drawing pretty lines here—every project you'll see below represents months of collaboration, late-night revisions, and honestly, a few coffee-fueled debates. This is what happens when sustainable design meets real-world constraints.

These aren't concept renders that'll never get built. Every project here has either been completed or is currently under construction. Some turned out exactly as planned, others... well, let's just say we learned a lot about soil conditions the hard way.

Meridian Tech Campus
COMPLETED 2023

Meridian Tech Campus

Mississauga, ON | 85,000 sq ft

This one pushed us harder than we expected. The client wanted a net-zero commercial space that didn't look like it was trying too hard. Took us six months just to nail down the solar integration without compromising the facade's clean lines.

Energy Efficiency

92% reduction

Timeline

18 months

Harbourfront Mixed-Use Complex
IN PROGRESS

Harbourfront Mixed-Use Complex

Toronto, ON | 120,000 sq ft

Currently watching this one rise from the ground and it's honestly surreal. We're combining retail, office space, and green terraces in a way that actually makes sense for how people move through the building. The construction crew keeps us on our toes though—last week we had to rethink our rainwater collection system on the fly.

Project Timeline

65% Complete - Est. completion Q3 2024

23

Months

LEED Gold

Target

3 Levels

Terraces

King Street Heritage Restoration

King Street Heritage Restoration

Toronto, ON | 45,000 sq ft

Restoring a 1920s warehouse while meeting modern commercial standards? Yeah, that was a puzzle. We spent weeks matching original brick patterns and another month figuring out HVAC routing that wouldn't destroy historical elements. Worth every headache though.

Key Achievements
  • 98% original facade preserved
  • Heritage designation maintained
  • Modern accessibility integrated
  • 40% energy use reduction
Technical Drawing
Interior View

Oakville Green Business Park

Oakville, ON | 150,000 sq ft across 4 buildings

Our most ambitious project to date. We're basically creating a small sustainable campus from scratch, complete with interconnected green spaces, shared geothermal systems, and enough solar panels to make your utility company jealous. Currently in month 9 of what'll probably be a 30-month journey.

Oakville Construction Progress
Construction Progress
Foundation & Site Work 100%
Structural Framework 75%
Envelope & Glazing 40%
MEP Systems 25%

Last updated: 3 days ago

Eglinton Avenue Commercial Tower

Toronto, ON | 22 Floors, 180,000 sq ft

Just got the green light last month and we're deep in the planning phase. This one's gonna be our tallest project yet. We're looking at vertical gardens on every third floor, smart building systems that actually learn usage patterns, and hopefully, if the budget holds, a green roof that doubles as a tenant amenity space.

Planning Milestones

Preliminary Design Approved

January 2024

Detailed Engineering - In Progress

Due: April 2024

Permit Submission

Planned: June 2024

Construction Start

Target: Q4 2024

Tower Rendering

22

Floors

Net Zero

Target

Scarborough Innovation Hub
COMPLETED 2022

Scarborough Innovation Hub

Scarborough, ON | 62,000 sq ft

This was one of those projects where the client really trusted our vision. They wanted something that felt innovative without being gimmicky, and I think we nailed it. The modular workspace design we implemented here has actually influenced how we approach flexible commercial spaces now.

68%

Energy Savings

14 mo

Build Time

Interior
Solar Installation

Got a Project in Mind?

We're always up for a good challenge. Whether you've got detailed plans or just a napkin sketch, let's talk about what's possible.